KATY BOARDWALK
Presented by the City of Katy Engineering, Allgood Construction worked to develop an untouched 30 Acres of land south of Katy Mills Mall. The development was the first step of a vision for an area of entertainment and hospitality open to the public. The project was to establish a Retention Pond consisting of islands throughout the design for a visual appeal. The 30 Acre Retention Pond included 300,000 Cubic Yards of excavation to be hauled offsite, with a timeline that was completed in 150 days of construction.
​
Phase 2
Phase 1
Presented by the City of Katy Engineering, Allgood Construction worked to develop an untouched 30 Acres of land south of Katy Mills Mall. The development was the first step of a vision for an area of entertainment and hospitality open to the public. The project was to establish a Retention Pond consisting of islands throughout the design for a visual appeal. The 30 Acre Retention Pond included 300,000 Cubic Yards of excavation to be hauled offsite, with a timeline that was completed in 150 days of construction.
​